Stockwell bus garage
Lansdowne Way, Stockwell
1951–4, Adie, Button and Partners
Listed grade II*, 29 March 1988
London’s last trams were withdrawn in 1952, leaving a demand for garages to house the expanded bus fleet. There was steel for garages to replace those destroyed in the war, but for new depots, George Adie and Frederick Button resorted to shell concrete, aided by engineer A. E. Beer.
Peckham’s bus garage, now demolished, repeated the construction popularised at the former bus depot in Bournemouth. Stockwell is also spanned by ten concrete beams linked by thin barrel vaults and a ring beam, although its span of 59.1m (194ft) makes it a third wider than the Bournemouth garage, and it is also longer. The difference is the use of arched portal frames – giant ribs that rise from 4.87m (16ft) to 16.46m (54ft) at their centre.
Between them, the arched cylindrical shells soar still higher, and the cathedral-like effect of their vaults is further enhanced by roof lights. To ensure adequate loadings, the frames’ reinforcement bars were welded rather than lapped – perhaps the roof’s greatest technical novelty. Some 200 buses can be garaged here.
This was first published in 'England's Post-War Listed Buildings' by Elain Harwood and James O. Davies. Read a review of the book and interview with Elain Harwood here.
Read other extracts from the book:
Featured articles and news
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.